Key figures

pipeline

17.2 GW

pipeline of projects

target

>5 GW

2027 capacity ambition (in operation and under construction) including ~ 4.2 GW in operation

countries

20

countries with local Development
+
international prospection

Development

Voltalia’s teams work on all steps of project development, from assessing potential and securing the best spots to launching construction after obtaining all required permits and authorizations.

Standard development process

Site Identification & Feasibility Studies
Environmental & Social Studies
Grid Connection Studies
Project Design
Land Securing
Permitting
Further Steps
Site Identification & Feasibility Studies

Site Identification & Feasibility Studies

We want to select the best sites for power generation. To achieve this goal, we carry out a comprehensive resource assessment (using software and campaign measures) and production assessments. At the feasibility stage, we also evaluate any potential environmental and social impacts and begin identifying solutions for the land and the grid connection.

Environmental & Social Studies

Environmental & Social Studies

We perform rigorous studies on all our sites to understand the potential impacts of our projects on the environment and local population. Our environmental and social studies also include appropriate mitigation measures to minimize our impact and foster local development in a sustainable way.

Grid Connection Studies

Grid Connection Studies

Grid connection is key to the success of a renewable energy project. Due to the specific characteristics of renewable energy, any project requires a detailed assessment of the power infrastructure features at the substation the plant is intended to be connected to.

Project Design

Project Design

From inception and throughout the different phases of development, our engineering team designs our plants to optimize power production in accordance with specific site constraints, available sources and grid capacity.

Land Securing

Land Securing

Land is a key factor to success in renewable energy development. Securing a plot of land involves different degrees of discussions with landowners, whether public or private, as well as with the local community to ensure public acceptance. It also entails negotiating agreements (rents) for use of the land.

development also include

Permitting

A project can only come to life if it complies with local regulations. Permitting refers to obtaining licenses, permits and other authorizations from different authorities and regulatory bodies. This process needs to begin at the start of the project due to potential delays in the evaluation of the application.

Permitting

Further Steps in the Development Process:

  • Participation in Tenders/Auctions
  • Project Financing or Due Diligence
  • Offtaker Negotiations
  • For these specific activities, consult our Energy Producer page.

btn All Case Studies

Development in Europe

Voltalia has been developing renewable energy projects on the European continent since 2005.
pipeline

5.1 GW

Pipeline of projects

TALAGARD
TALAGARD
SERRA BRANCA
SERRA BRANCA

Development in LatAm

Voltalia has been developing renewable energy projects on the South American continent since 2005.
pipeline

6.5 GW

Pipeline of projects

Development in Africa

Voltalia has been developing renewable energy projects on the African continent since 2008.
pipeline

2.9 GW

Pipeline of projects

btn Reach Us

Contact Us


Our Development team is constantly looking for solar, wind, hydro and biomass renewable technology opportunities in emerging markets worldwide. We collaborate with clients to provide the best Project Development solutions and would be more than happy to work with you. Please contact one of our offices for more information.