Talagard

icon
2019

connected

icon
5 MW

power

icon
6.5

hectares

icon
12 796

solar panels

icon
7 875 MWh

annual production

icon
3 000

homes with clean energy

icon
973

tons of CO2 avoided per year

overview

 

The Talagard Solar Park is located at the entrance to the Talagard massif, not far from the A7 motorway, on a former municipal landfill that was decommissioned in the 1980s. This solar park built and operated by Voltalia is therefore located on land belonging to the City of Salon-de-Provence, a municipality that has a strong desire to develop renewable energies on its territory.

Covering an area of nearly 6.5 ha, this 5 MW park can produce 7,875 MWh of average annual production corresponding to the consumption of 7,292 inhabitants (excluding heating).

Its operation is scheduled for 25 years, ending in 2044 with the possibility of extension.

Contact Us


Please feel free to get in touch with one of our offices if you need more information.

btn Reach Us