BOULANGER (CPPA) Name of the project: Boulanger Installed capacity: 5 MW Commissioning date: 12/2019
Boulanger and Voltalia signed the first Corporate PPA agreement in France May 21, 2019: it bonds directly the Boulanger Group to a solar plant which Voltalia will build, own and operate.
Boulanger and Voltalia have committed on a first 25-year Corporate PPA, a pioneering approach in France. It enables the investment in a new solar plant project, increasing the capacity of “green” watts installed in France. Built and operated by Voltalia, with a capacity of 5 MW, the power plant will be commissioned before end 2022.