Lercara
The project was fully developed and constructed by Voltalia Italia, and is scheduled to enter operation in November 2024.
This is an agricultural land with a total extension of about 6 HA that has a regular orographic structure and is mostly flat.
The connection to the power grid is through a 100 m overhead line, in-out on the MT Rocca line.